Morgan and Oswood Builds Underpass in Idaho.
Using the Model 300 driver/extractor, Dave Jellum with Morgan and Oswood, installs a cut off wall next to live rail road tracks to support the heavy rail traffic during the excavation process. The driven piles will be done with the contractor owned 40,000 foot pound single acting diesel hammer. The patented two stage suppressor provides the crane operator a smooth transition from full vibration speed to off. Single stage suppressors with comparable line pull are too rigid and create unacceptable crane boom vibration.
The photos display an affective mathod for stepping sheets in high blowcount non cohesive silts and sands.