Facebook Icon YouTube Icon LinkedIn Icon Twitter Icon RSS Icon
APE Partners Foundation Equipment Helmets to Hardhats I Make America APE Holland Tracsa Sitsa

Your First Stop for Piledriving Technology News

Archive for "Jun 15 2007"

APAC GOES APE

While driving 130-ft long 30″ diameter steel pipe piles on the West Bay Bridge project near Panama City, Fl., APAC Heavy Division was experiencing much downtime and unreliable performance with a direct drive diesel hammer supplied by one of APE’s competitors.

APAC Equipment Manager, Bradley Briscoe called APE Florida.

A flawlessly prepared APE D-62 diesel pile hammer with an offshore lead set-up was shipped to the jobsite in the Florida panhandle from the APE yard in
Winter Haven, Fl. The APE D-62 not only decreased the driving time per individual pile, but, after driving hundreds of piles, the hammer has had no downtime.
“It starts easily and drives all day” stated Briscoe. These sentiments are echoed by the pile crew which is very happy with the increased production that they are getting.

Once again, an APE diesel hammer proves to be the right tool for a large, high-production project.

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Buzz
  • Yahoo! Buzz
  • MySpace
  • Digg
  • StumbleUpon
  • del.icio.us
  • Add to favorites
  • Print
  • email
  • RSS

Russia

The Russians once again go Variable Moment. After great success in their 1st delivery of APE’s high tech Model 170 VM a second was shipped to the frozen land of Russia. More order’s are in the works. The 170vm works very well driving through permafrost and still keeps start and stop vibrations to almost nothing.

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Buzz
  • Yahoo! Buzz
  • MySpace
  • Digg
  • StumbleUpon
  • del.icio.us
  • Add to favorites
  • Print
  • email
  • RSS

Developer M. Alfieri Co. Inc. with APE D19-42

When Nate Stone of M. Alfieri Co. Inc. was faced with driving 1,300 10×42 H-Piles for a parking garage, he called APE/J&M Northeast. A D19-42 diesel hammer with semi-fixed leads was recommended. The work was done in 3 phases. With the joint expertise of Local 1456 NY/NJ dockbuilders, Local 825 Operators, and APE the job was a huge success. We look forward to working with M. Alfieri when they drive the piles for the upcoming office tower.

Contact Paul Kuzik at 201-400-8356 for more information on this job. Count on APE/J&M for all your pile driving equipment needs.

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Buzz
  • Yahoo! Buzz
  • MySpace
  • Digg
  • StumbleUpon
  • del.icio.us
  • Add to favorites
  • Print
  • email
  • RSS

News Navigation

Search

APE Branches

Latest Posts

  • Dec 09 2015
    Northern Exposure
  • Jul 28 2015
    The “SMACK DOWN” New APE D70-52
  • Feb 07 2015
    Going APE for Iron Dog
  • Jan 27 2015
    APE is Breaking the Mold on Traditional Drill Tools
  • Sep 04 2014
    APE China’s first 400 built in China get’s the job done!

  • APE News Article Calendar

    June 2007
    M T W T F S S
    « May   Jul »
     123
    45678910
    11121314151617
    18192021222324
    252627282930  
  • APE News Article Archives

Update News

APE Partners GSA SmartPay Deef Foundations Institute Pile Driving Contractors Association IMECO Collins Company Internation Association of Foundation Drilling Terresolve Foundation Associates SEMW