The “SMACK DOWN” New APE D70-52
K+S Potash Canada (KSPC) is building a potash handling and storage facility at Port Moody, British Columbia. Potash products arriving by rail from the Saskatchewan-based mine will be stored on site and transported to vessels destined for K+S Group’s international clients. There was roughly 700 driven pipe pile ranging from 24” to 36” that needed to be driven. Keller Foundations opted to go with the APE D70-52 as their work horse for the majority of these pile. This 7.0 metric ton ram is pound for pound the hardest hitting hammer out there today, and its new octagon design allows for better cooling and larger fuel capacity, making hard driving jobs……just a little easier.