This is the Bainbridge Island Ferry Terminal Dolphin Replacement. Joe Claus is running the job. An APE Model 300 pre-places the 36″ Dolphin pile and a D46 drives them to tip elevation.

The 625 Power Unit is also modified to operate an APE 100 Driver/Extractor with a wood clamp installed on it to pull the older and damaged wood pile dolphins.

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Buzz
  • Yahoo! Buzz
  • MySpace
  • Digg
  • StumbleUpon
  • del.icio.us
  • Add to favorites
  • Print
  • email
  • RSS