Dean Construction goes APE!
Toronto:
Recently Brooks Dean of Dean Construction called with an immediate need for a vibro to drive sheet piles into Toronto Harbor. Dean, among several other foundation contractors, have been involved in the ongoing revitalization and expansion of the Toronto waterfront. In this instance sheets are being driven to shore the waterfront for installation of a new ferry boat dock that will access the Toronto Public Airport located on a small island in Lake Ontario. A J&M 216 was sent in and made short work of the sheet piles.
This past January APE sent in a D19 the drive piles for an extension of the existing boardwalk which lines the beautiful waterfront area. Thanks again to Dean for coming to APE/J&M for their foundation needs.