Golden State Bridge
When Golden State Bridge of Northern California landed a job to drive 115′ long 67″ pipe pile in Morro Bay California, they called APE! Why? Because APE has the equipment and the knowledge to get the job done!
Using a APE 300 vibro to set these pile weighing 50 tons, Golden State Bridge followed it up with APE model D100-13 Diesel hammer to drive them home!
“This was a great combination on this project and it was just what Dr. APE ordered to make our project a success.” Along with 24″ pipe pile for the trestle pile and some 24″ pipe pile for the abutment pile driven with a D36-32, this was another job well done!