Neither Snow, nor More Snow, nor even More Snow…
Can stop King Kong from helping Aldridge Electric drive 9.5ft and 10.5ft diameter casing to grade for power line project in snowy and bitterly cold northern New England.
The nature of power line construction is that time is of the essence and the jobsite does not shut down for inconveniences like a foot of snow. Knowing that, Aldridge chooses APE and the reliability they have come to know and trust, as well as the knowledge that if something does go wrong, a foot of snow will not keep APE personnel from being on site and doing whatever it takes…