Don Schroeder with Wilder Construction and crew install the temporary bridge piles in the wet lands outside Carnation, WA. The main foundations will be drilled shafts. The way the crew tackled the batter piles on the work trestle is very creative. Using a swinging set of leads and a simple pin arrangement, the batter piles installed very smoothly.

In addition to the swinging leads, there is a pile monkey and fixed pile gate holding the pile in the leads.

For more information on APE lead systems feel free to contact us here at the main office or one of our satellite locations.